Six Nations – Reconstruction of Rd 265
Six Nations Public Works retained CJDL to design and reconstruct a section of Onondaga Road, Ohsweken. A significant hill that severely restricts visibility for motorists needed to be lowered. Two driveways enter the road at the top of the hill creating a challenge to maintain access to properties at reasonable slopes. Existing utilities needed to be lowered to suit the revised road grades and service is to be maintained throughout construction. Construction was completed fall 2012.
Prior to Construction
(click to enlarge)
After Construction
(click to enlarge)
Prior to Construction
(click to enlarge)
After Construction
(click to enlarge)



